According to Vartha Bharati, the Tungabhadra Board has released 50 cusecs of water from the Tungabhadra reservoir into the High-Level Canal (HLC) to ensure a steady supply of drinking water for urban and rural areas within the right-bank command area. The decision was taken as a precautionary measure to prevent any disruption in water services during the ongoing monsoon season.
Local authorities noted that the reservoir has been receiving significant inflows due to persistent rainfall in the Tungabhadra catchment area. As of Saturday evening, the dam recorded an inflow of 77,386 cusecs, with a corresponding discharge of 75,286 cusecs into the river. The release into the HLC is intended to balance the reservoir's water levels while simultaneously addressing the critical drinking water requirements of the Vijayanagara district and surrounding regions.
This release is part of routine water management operations conducted by the board to manage high inflow periods effectively. By prioritizing the HLC, officials aim to maintain consistent access to potable water for communities that rely on the canal network, despite the fluctuations in river levels caused by the heavy seasonal rains.
The report provides specific details regarding water management operations by the Tungabhadra Board, which is a standard administrative procedure during monsoon periods. The information is internally consistent and aligns with typical seasonal water release protocols in the Vijayanagara region.
No corroborating trusted sources found.
Original report: Vartha Bharati